Skip to content. | Skip to navigation

Manor Bay Estates Development, Brampton, Ontario, Canada

Vertical Formwork solutions at Commercial Development
With a total surface of 60,000 sq ft and 5-storey, this building will be ideal for office space for large or small businesses as it provides an optimal location with direct highway exposure and offers over 200 parking spots.

Description

ULMA partnered with our customer to provide a vertical formwork solution, including climbing and safety platforms, on this modern hybrid structure that will offer office space for large or small businesses at the Manor Bay Estates Development.

ULMA Solution

The building, which is currently under construction, will consist of a 5 storey steel structure with reinforced concrete, elevator, and stair cores. As the cores would be sequenced ahead of the remaining structure the solution provided allowed for a self-supporting formwork assembly, with working and safety platforms.

Pour heights ranged from 3.5-5.5m and the assembly was efficiently cycled using ULMA’s Stripping corner max and a mobile crane.

  • ORMA panels were used to form the vertical walls.
  • Our new stripping corner max was used to strip and fly the cores.
  • Quick and efficient lifting cycle by small crew of workers.
  • External BMK climbing platform to support ORMA panels and workers, allowing core tower to precede installation of other structural elements.
  • Internal KSP platform to support ORMA panels and customer’s working crew.