185 Broadway tower, New York, USA

Superstructure in the financial heart of New York
Rising above the city's financial heart, the tower will offer magnificent views of the skyscrapers. Residents and visitors will have a wide array of dining, entertainment, and fitness options available.

Description

The 24.200 m2, 124 meters tall, 31-story mixed-use superstructure just topped out last week in Lower Manhattan. 185 Broadway was designed by FX Collaborative Architects and developed by SL Green. It is expected to have over 200 rental units, including studios, 1, 2, and 3-bedroom apartments. The structure will also include retail spaces and three floors of commercial space.

The new building is strategically located next to the recently renovated Fulton Street Subway Station and one block away from the World Trade Center. Rising above the city's financial heart, the tower will offer magnificent views of the skyscrapers. Residents and visitors will have a wide array of dining, entertainment, and fitness options available since its close to renowned places such as the South Street Seaport, One World Observatory, TriBeCa, and various landmarks of New York City.

ULMA Solution

ULMA provided over 25 HWS Perimeter Safety Screens to cover the building's perimeter, ensuring the safety of both workers and pedestrians during the construction of the superstructure. The system offers protection in four levels: the level being poured, and the previous three. Additionally, the self-climbing system ensures excellent protection against weather, reduces the visual height effect, and it is highly versatile since it can be easily adapted to different geometries.

The screens were installed by crane and then lifted using the hydraulic system. The recently launched telescopic screens were used in this project. All the screens arrived in pre-assembled condition to the job site. Standard telescopic screens consist of an2,4 m wide fix screen with one or two telescopic panels on the sides that can be opened up to around 3,8 m on site.

The technical solution provided by ULMA for the climbing system, Rail Climbing Formwork RKS for the southwest part of the building, consisted of four platforms. The primary purpose of the RKS platform is to serve as a support for the forms, the working platforms, and the live load.