Main Sewage Pumping Station, Jebel Ali, Dubai, UAE

Comprehensive solutions for the entire structure
The Jebel Ali Sewage Pumping Station in Dubai has an area of 300 m², with walls between 2.2 m and 7.3 m high and 25 cm thick slabs.

Description

The Jebel Ali Sewage Pumping Station in Dubai has an area of 300 m², with walls between 2.2 m and 7.3 m high and 25 cm thick slabs.

ULMA Solution

The walls were built with ENKOFORM V-100 vertical formwork system. UCAB frames withstood the concrete pressure in the construction of single-sided walls.

Slabs were built with ENKOFLEX horizontal formwork system shored on T-60.

Formwork works lasted 5 months.